ORDER UNIT 18 CIVIL ENGINEERING TECHNOLOGY ASSIGNMENT & GET 100% ORIGINAL SOLUTION AND QUALITY WRITTEN CONTENTS IN WELL FORMATS AND PROPER REFERENCING.

Qualification - Higher National Certificate Construction and the Built Environment

Unit Name - Civil Engineering Technology

Unit Number - Unit 18

Grab the best HND assignment help from our professional writing service. We can give you a well-written and fully customized solution before the promised timeframe.

Assignment Title - A bridge too far?

Learning Outcome 1: Explain the methods and techniques used in civil engineering for earthworks and substructures.

Learning Outcome 2: Present a site safety plan, risk assessment and method statement for a given civil engineering activity.

Learning Outcome 3: Evaluate a given civil engineering problem and propose a solution.

Learning Outcome 4: Prepare a design proposal for a new infrastructure project.

DO WANT TO HIRE TUTOR FOR ORIGINAL UNIT 18 CIVIL ENGINEERING TECHNOLOGY ASSIGNMENT SOLUTION? AVAIL QUALITY HIGHER NATIONAL CERTIFICATE CONSTRUCTION AND THE BUILT ENVIRONMENT ASSIGNMENT WRITING SERVICE AT BEST RATES!

Civil Engineering Earthworks and Substructures - N5E18 Civil Engineering Technology for Level 4 and Level 5 HND in Construction and The Built Environment

Assignment Brief

Task 1: You work for a Civil Engineering company as a Trainee and are working on a major dual carriageway road construction works. The local council are bringing a delegation of councillors around the development and your boss asks you to provide him with the results of a desk-top survey outlining common methods and techniques used in earthworks and embankments. He asks you to cover the following in six posters:

1.Techniques used in deep excavations and trenching works.
2. Methods and techniques used to create complex foundations.
3. Methods and techniques used in piling works.
4. Methods and techniques used in drainage works. (include an explanation of groundwater problems and techniques used to deal with issues of ground and slope stability and temporary and permanent dewatering techniques).
5.Methods and techniques used in culvert construction.
6.Methods and techniques used in underpasses and utilities.

In order to prepare to answer questions from the councillors, you are asked to prepare a series of PPT slides (about 6 should suffice) in which you analyse methods and techniques used in large complex earthmoving operations and deep excavations, together with an evaluation of methods and techniques used to deal with issues of ground and slope stability.
The above task address LO1: P1, P2, P3, M1 & D1.

Stop being so overwhelmed with the assignment work of Diploma course and get the Diploma assignment help to do your work on time and meet professor's expectations

Task 2: After the councillors have visited, they write a letter as with the following request:
"Can you provide a copy of the Safety Plan, the Risk Assessment and Method Statement that you spoke about for the road development site"

Your boss admits your department are not really compliant with the companies safety strategy. He asks that you create a more comprehensive document that he can forward to the councillors which identifies the hazards, risks and safety arrangements for excavations, working in confined spaces, working on structures and working within temporary works on highways.
The document you produce will have three sections: a safety plan, at least two risk assessments and at least two method statements for the road project that the councillors wish to see. In the document discuss how the three sections meet relevant health & safety legislation and codes of practice related to civil engineering sites and make a justification for the site safety plan, risk assessments and method statements report you have produced for the related earthwork activities at the site
The above task address Learning Outcome 2: P4, P5, M2, D2.

NO PLAGIARISM POLICY - ORDER NEW UNIT 18 CIVIL ENGINEERING TECHNOLOGY ASSIGNMENT & GET WELL WRITTEN SOLUTIONS DOCUMENTS WITH FREE TURNTIN REPORT!

Task 3: A late revision to the road project includes a slight deviation around some woodland. However, the deviation will include the construction of a bridge. You are asked to put together a report that discusses, proposes and justifies why the deviation needs to be made and what construction methods will be used to construct the bridge. Remember the road is a dual carriageway - but also needs to carry pedestrian traffic. The report (about 1500 words) should have discrete sections that address environmental contexts, quality contexts, geotechnical contexts. and economic contexts.
The above task address Learning Outcome 3: P6, P7, M3, & D3

Developing Solutions for Hydrostatic and Hydrodynamic Problems - HNCB43 Hydraulics for Civil Engineering, HND in Construction and the Built Environment

 

Task 4: As part of your traineeship, you are asked to work with the Design Team. They are working on the plans for the bridge. They ask you to put together an illustrated document that describes a range of methods and techniques used to create bridges and the different specifications of bridges.
Your illustrated document should include proposals for flexible highway construction foundation criteria and related geotechnical parameters together with descriptions of
•Methods and techniques used to create flexible highways.
•Methods and techniques used in highway link and junction design.
•Methods and techniques used in flexible pavement design.

Learning Outcomes and Assessment Criteria

Pass

Merit

 

LO1 Explain the common methods and techniques used in civil engineering earthworks and substructures

 

D1 Evaluate methods and techniques used to deal with issues of ground and slope stability.

P1 Discuss earthworks activities, equipment and techniques.

P2 Describe methods and techniques used to create complex foundations, piling works and drainage works.

P3 Describe methods and techniques used in culvert construction, underpass construction and provision for utilities.

M1 Analyse methods and techniques used in large complex earthmoving operations and deep excavations.

LO2 Present a site safety plan, risk assessment and method statement for a given civil engineering activity

D2 Justify a site safety plan, risk assessments and method statements report for activities related to a given civil engineering project.

P4 Identify the hazards, risks and safety arrangements for excavations, working in confined spaces, working on structures and for working within temporary works on highways.

P5 Develop and present a site safety plan, risk assessments and method statements for a given civil engineering activity.

M2 Discuss health & safety legislation and codes of practice related to civil engineering sites.

LO3 Evaluate a given civil engineering problem and propose a solution

LO3 LO4

 

D3 Justify the selection of specific features in the development of a civil engineering solution to a given problem.

P6 Evaluate the environmental, quality, geotechnical and economic contexts of a given civil engineering problem.

P7 Propose a solution to a given civil engineering problem.

M3 Illustrate how the environmental, geotechnical, quality and economic contexts of a problem are addressed through a proposal.

LO4 Prepare a design proposal for a new infrastructure project

P8 Describe methods and techniques used in highway design.

P9 Develop a civil engineering design proposal for a new infrastructure project.

M4 Analyse methods and techniques used to create bridge foundations, flexible highway construction foundation criteria and related geotechnical parameters.

AVAIL UNIT 18 CIVIL ENGINEERING TECHNOLOGY - HIGHER NATIONAL CERTIFICATE CONSTRUCTION AND THE BUILT ENVIRONMENT ASSIGNMENT HELP SERVICE OF MIRACLESKILLS.COM AND SAVE HIGHER MARKS!

Assignment Help for Unit 29 Geotechnics and Soil Mechanics - Higher National Diploma in Construction and the Built Environment

RELATED COURSES & ASSIGNMENT SERVICE!!


COMMENTS(0)

LEAVE A COMMENT


Captcha

 

 

Are You Looking for Civil Engineering Technology Assignment Help?


Access the best Higher National Certificate Construction and the Built Environment Assignment Help services for its academics units and courses such as:-

  • Unit 42 Highway Engineering Assignment Help
  • Unit 2 Construction Technology Assignment Help
  • Unit 14 Building Information Modelling Assignment Help
  • Unit 6 Construction Information (Drawing, Detailing, Specification) Assignment Help
  • Unit 27 Construction Technology for Complex Building Projects Assignment Help
  • Unit 3 Science & Materials Assignment Help
  • Unit 26 Advanced Construction Drawing & Detailing Assignment Help
  • Unit 8 Mathematics for Construction Assignment Help
  • Unit 30 Advanced Structural Design Assignment Help
  • Unit 36 Advanced Building Information Modelling Assignment Help