ARE YOU LOOKING FOR BEST GRADES SOLUTIONS FOR PEARSON BTEC LEVEL 5 HND IN CONSTRUCTION AND THE BUILT ENVIRONMENT ASSIGNMENTS? APPROACH AT MIRACLESKILLS AND GET HIGH GRADED SOLUTION FROM SKILLS ACADEMIC WRITERS!
Qualification - Pearson BTEC Level 5 HND in Construction and The Built Environment
Unit Name - Advanced Construction Drawing and Detailing
Unit Level - Level 5
Unit Number - Unit 26
Unit Credit - 15
Unit code - H/615/1412
Assignment Title - Advanced Construction Drawing & Detailing
Learning Outcome 1: Assemble complex construction information packages to meet diverse project needs
Learning Outcome 2: Integrate design and construction information data from multiple sources
Learning Outcome 3: Evaluate the relationship between CAD and BIM data in the production and management of construction information
Learning Outcome 4: Prepare construction information packages for a given complex building project.
MOST RELIABLE AND TRUSTWORTHY UNIT 26 ADVANCED CONSTRUCTION DRAWING AND DETAILING - PEARSON BTEC LEVEL 5 HND IN CONSTRUCTION AND THE BUILT ENVIRONMENT ASSIGNMENT HELP AND ASSESSMENT HELP SERVICES AT YOUR DOORSTEPS!
The information required to construct buildings and infrastructure is at the heart of the construction process. As structures become more complex, the types of information required become equally complex. The ability to produce, manage and understand construction information continues to be a key skill at all levels of the industry.
The aim of this unit is to provide students with an in-depth consideration of the way that construction information is created, managed, and shared throughout the lifecycle of a built asset. In addition to understanding the types of information required for complex projects, students will explore the development and use of standards to ensure consistency and interoperability of data captured and shared, both in a geometric and non-geometric fashion.
Through this unit students will engage in the ways construction drawing and detailing have evolved and will be able to gain knowledge and skills in documenting projects using modern methods and technologies.
Strategic Analysis: Determine the internal strengths and weaknesses of Specific Businesses in Higher National Diploma in Business Studies
LO1 Assemble complex construction information packages to meet diverse project needs
Standards:
Office standards (templates, formats, etc.)
Industry standards (formats, information packages, etc.) Classification systems (Uniclass, Omniclass, etc.) Common Arrangement of Works (CAWS)
Best practice drawing and detailing
File formats and use of complex technology to create standards, both organisational and project-based.
General arrangement drawings:
Splitting complex plans, match lines Room/space delineation Annotation
Cross-referencing.
Detail drawings:
Identifying detail needs Detail annotation
Level of Definition (Level of Detail)
Linking specification data with drawing data
The definition of graphical and non-graphical data in the context of BIM.
Exploring Insights: Conduct small-scale research, Information Gathering, and Data Collection Methods in Higher National Diploma in Business (RQF)
LO2 Integrate design and construction information data from multiple sources
Drawings:
Creating drawings from traditional systems, such as Computer Aided Design (CAD) software and BIM authoring software
The differences between traditional 2D drafting and 3D modelling The use of 3D modelling as a source to create 2D drawings Linking 2D drawings and data into 3D modelling tools.
Specifications:
Specification writing
Linking specification data within a BIM authoring platform. Schedules or data sheets:
Schedules from traditional means
Creating schedules from BIM authoring platform
Creating co-ordination reports from BIM Co-ordination platform.
Detailing:
Creating details from 2D CAD software
Creating detail drawings from 3D BIM authoring platform Information management within BIM authoring platform Details which link to 3D data.
Mastering Management Accounting: Demonstrating Understanding of Systems in Higher National Diploma in Business Studies
LO3 Evaluate the relationship between CAD and BIM data in the production and management of construction information
Design information:
CAD design drawings and the use of modelling tools to inform building shape and form
BIM authoring solutions which link to design data Advanced digital tools that automate shape and form
Co-ordinating CAD and BIM data to review detailed design solutions prior to construction
Co-ordinating discipline-specific design information.
Construction information:
Linking CAD data to BIM authoring software
Using BIM authoring software to manage and produce information
Using open file formats (e.g. Open BIM) to ensure all data can be transferred across differing platforms
Understand the term ‘project information model (PIM)'.
Handover and post-occupancy information:
Transfer the information from a project information model to the asset data Linking CAD data to a facilities management tool
Archiving data at handover
Updating data through the life of a project
Updating drawings or model information through the life of a project Maintenance and repair data.
HIRE PROFESSIONAL TUTORS FROM MIRACLESKILLS.COM AND GET BEST QUALITY UNIT 26 ADVANCED CONSTRUCTION DRAWING AND DETAILING ASSIGNMENT HELP AND PEARSON BTEC LEVEL 5 HND IN CONSTRUCTION AND THE BUILT ENVIRONMENT ASSESSMENT HELP SERVICES!
LO4 Prepare construction information packages for a given complex building project
Design stages and data drops:
Allocating tasks to a particular supplier
Defining information or data deliverables over the lifecycle of a given project
Defining what type of information should be shared and how this is stored and managed at all stages of a project.
Construction information packages:
Design responsibility matrix
Reviewing CAD and BIM information at all times through the life of a project Defining the data deliverable for a given project
Reviewing co-ordination issues during the construction stages Transferring ownership of BIM data to differing sources.
Foundations of Computing: Define basic algorithms to carry out an operation for Operational Efficiency in BTEC Higher National Diploma (HND) Studies
Learning Outcomes and Assessment Criteria
Pass
|
Merit
|
Distinction
|
LO1 Assemble complex construction information packages to meet diverse project needs
|
|
P1 Discuss the importance of defining standards to create and manage construction drawings
P2 Evaluate the importance of consistent and accurate information in regard to creating construction drawings for a complex project
|
M1 Analyse how a consistent set of standards can drive greater efficiencies throughout a project
M2 Utilise both BIM and CAD methodology to ensure construction information packages are correct and clear for a complex project
|
LO1 and LO2
D1 Create a consistent set of standards for both a complex construction project and an organisation, recognising ways to retain consistency and clarity within the information shared and created to avoid error and duplication
|
LO2 Integrate design and construction information data from multiple sources
|
|
P3 Assess ways in which construction information can be created in both a traditional and a digitally integrated fashion
|
M3 Analyse the difference between CAD and BIM systems in the creation of design and construction information for a given project
|
|
LO3 Evaluate the relationship between CAD and BIM data in the production and management of construction information
|
|
P4 Evaluate the advantages of using a BIM-based system to create complex construction information
P5 Discuss ways in which BIM authoring tools can consistently create accurate drawings and details for a complex project
|
M4 Review the ways in which BIM data can be accurately created and maintained throughout all stages of a complex project
|
LO3 and LO4
D2 Critically evaluate ways in which BIM data can support more accurate information on a complex project
|
LO4 Prepare construction information packages for a given complex building project
|
|
P6 Create a set of construction documents for a complex building project using defined standards
P7 Demonstrate how information created in a non-graphical way can be utilised within a BIM authoring platform
|
M5 Analyse how construction information packages can be created accurately in line with detailed requirements outlined by a given client for a complex construction project
|
|
P8 Discuss how drawing packages can be organised within the context of a BIM authoring platform
|
|
|
ARE YOU LOOKING FOR BEST GRADES SOLUTIONS FOR UNIT 26 ADVANCED CONSTRUCTION DRAWING AND DETAILING - PEARSON BTEC LEVEL 5 HND IN CONSTRUCTION AND THE BUILT ENVIRONMENT ASSIGNMENTS? APPROACH AT MIRACLESKILLS AND GET HIGH GRADED SOLUTION FROM SKILLS ACADEMIC WRITERS!