SAVE YOUR HIGHER GRADE WITH ACQUIRING UNIT 3 ENGINEERING PROJECT ASSIGNMENT HELP & QUALITY ASSESSMENT HELP SERVICES OF MIRACLESKILLS.COM

Qualification - BTEC Level 3 Qualification in Engineering

Unit Name - Engineering Project

Level - Level 3

Unit Number - Unit 3

Unit Code - T/600/0252

Assignment Title - Design Project

Purpose:

Demonstrate your ability to carry out various tasks and manage your time efficiently in order to complete a chosen project from beginning to conclusion. You are also required to present the evidence of your progressive project work as indicated in the assessment brief, verbally and in writing, for assessment.

This unit will provide learners with opportunities to present their own solutions and should enable them to feel confident carrying out project work in their chosen engineering discipline.

STICK WITH MIRACLESKILLS WHEN YOU ARE FACING PROBLEMS TO GRAB IDEAL SOLUTIONS FOR YOUR BTEC LEVEL 3 QUALIFICATION IN ENGINEERING ASSIGNMENTS!!

Scenario
As an engineering technician you are given the responsibility of organising and managing a project which will include several ongoing tasks over a set period of time, and against a set specification. These may include any combination of subjects/ tasks which will require an appropriate process to be followed.

Assignment Task 1 Prepare and maintain project records from initial concepts through to solution that take account of and record changing situations.

Assignment Task 2 Prepare a project specification.

Assignment Task 3 Agree and prepare the procedures that will be followed when implementing the project.

Assignment Task 4 Use appropriate techniques to evaluate three potential solutions and select the best option for development.

Assignment Task 5 Outline the project solution and plan its implementation.

Assignment Task 6 Monitor and record achievement over the life cycle of the project.

Assignment Task 7 Implement the plan and produce the project solution.

Assignment Task 8 Check the solution conforms to the project specification.

Assignment Task 9 Prepare and deliver a presentation to a small group outlining the project specification and proposed solution.

Assignment Task 10 Present a written project report.

Assignment Task 6a Maintain detailed, concurrent records throughout the project that clearly show progress made and difficulties experienced.

Assignment Task 4a Use a wide range of techniques and selection criteria to justify the chosen option.

Assignment Task 8a Evaluate the project solution and suggest improvements.

Assignment Task 10a Present coherent and well-structured development records and final project report.

Assignment Task 11 Independently manage the project development process, seeking support and guidance where necessary.

Assignment Task 12 Evaluate the whole project development process, making recommendations for improvements.

MIRACLESKILLS IS THE RIGHT PLACE FOR YOU IF YOU ARE LOOKING FOR BEST SOLUTIONS FOR YOUR UNIT 3 ENGINEERING PROJECT - BTEC LEVEL 3 QUALIFICATION IN ENGINEERING ASSIGNMENTS AT NOMINAL PRICE!

Tasks:

Identify and select a project

• The project chosen needs to be simple, if possible try and select something you know about, something related to a hobby or interest is a good place to start.

• Remember this is the vehicle that allows you to demonstrate that you can follow a project process procedure.

• Discuss your choice with your Tutor to establish its suitability for your project.

Assignment Task 1:

Prepare and maintain a Logbook / Diary as specified by your tutor

• This needs to be an on-going record of your tasks, decisions, and meetings, basically anything that has been undertaken towards your project.
• A week by week record of everything to do with your project.
• You can include mind map(P5) within this task.

Assignment Task 2:

a) Produce a Project Proposal

This is based on the information that the customer has provided you with. It is a brief (short) description that you have taken from discussion with the customer. To achieve this, you should complete the "Project Proposal Form" attached to this Assessment Brief (Appendix 1).

b) Prepare a Project Specification

A specification details in technical terms how the final project outcome will conform. It should be written in terms of what is needed and when it is to be completed. It should be agreed with the customer, it can however be modified (changed) at a later date as long as it is justified and agreed by all parties. The specification should include:
• Introduction (a brief description of the overall project)
• Background (a brief description about other similar products/services to your own proposal)
• Proposed work (details of the main tasks to be carried out and list of expected outcome etc.)
• Project timeline (this could be done in the form of a table giving details of components, delivery time, person responsible for etc.)
• Conclusion (stating the significance of the project, and how it will impact or improve the end user's requirement

Note: the word processed evidence of your work for Assignment Task 2 must be saved electronically, and hard copies of the Project Proposal together with the Project Specification to be inserted in your portfolio.

GET GUARANTEED SATISFACTION OR MONEY BACK UNDER UNIT 3 ENGINEERING PROJECT ASSIGNMENT HELP SERVICES OF MIRACLESKILLS.COM - ORDER TODAY NEW COPY OF THIS ASSIGNMENT!

Assignment Task 3:
Agree and prepare the procedures

In small groups discuss and establish the procedure with which you consider you will need to follow in order to effectively identify the key elements of your project.

a) The evidence of discussion, mind maps, sketches etc. must be recorded in your logbook/diary.
b) The summary of your discussion with the list of key elements to be word processedand inserted in your portfolio.
c) To produce a flow chart of the sequence of your tasks (you can use MS Word, Excel, or Project) of your chosen procedure and insert it in your portfolio.

Note: The evidence of your work for Assignment Task 3 b) and c) must be saved electronically, and hard copies to be inserted in your portfolio.

Assignment Task 4:

a) Identify potential solutions

1. Identify a range of ideas (must be minimum three ideas), each needs to be clearly explained using sketches and diagrams that are comprehensively explained by annotating the sketches.
2. A short written explanation to support your ideas.

b) Evaluatepotential solutions

• For each idea (one at a time) establish whether or not an idea meets the criteria set out in the specification.

c) Select the best option

1. Develop a method that will show all the results of your evaluations (e.g. a chart/table that clearly shows each solution's details. This will also help you with Assignment Task 8 (P8)).

2. From your evaluation in part 1. above decide which idea should beadopted as your final project solution.

Note: all sketches, rough work etc. must be recorded in your logbook/diary. All word processed written explanations, tables, drawings etc. must be saved electronically and hard copies inserted in your portfolio.

Assignment Task 4a:

Use a wide range of techniques and selection criteria to justify the chosen option

• This is in line with Assignment Task 4 c), but you will need to produce more detailed evaluation of your selected solution, i.e. throughout your project you will need to make choices about specific elements of your Assignment Task and there may be several options to solving these in which case you need to give explanation and justification to your final choice.

Note: your evaluations and justification must be word processed and saved electronically, with hard copy inserted in your portfolio.

Assignment Task 5:

a) Outline the project solution
• Identify key areas, produce a mind map.
• Develop chosen key areas from your mind map, expand these to form the tasks you need to undertake and plan for.

b) Plan for your projects implementation
• Produce a Gantt chartbased on your specification's timeline (you can use MS Word, Excel, or Project) to present your tasks planning.

Note: your Gantt chart must be saved electronically, and a hard copy inserted in your portfolio.

DO WANT TO HIRE TUTOR FOR ORIGINAL UNIT 3 ENGINEERING PROJECT ASSIGNMENT SOLUTION? AVAIL QUALITY BTEC LEVEL 3 QUALIFICATION IN ENGINEERING ASSIGNMENT WRITING SERVICE AT BEST PRICE!

Assignment Task 6:

Monitor/record achievement throughout the project

• This is an integral part of recording your achievements throughout the time spent on the project, and is separate from your logbook/diary and Gantt chart. To achieve this pass criteria, you should:

1. Identify the milestones (objectives) from your Gantt chart.
2. Use each milestone as a topic.
3. Under each milestone, briefly explain the tasks carried out and the time spent to achieve that objective (you should be able to gather the information needed from your logbook).
4. For each milestone, compare the actual time taken to achieve the objective with the time allocated in your Gantt chart, if it was shorter or longer than the time allocated, briefly explain the reason/s.

Note: your word processed work for this Assignment Task must be saved electronically, and a hard copy to be inserted in your portfolio.

Assignment Task 6a:

Maintain detailed, concurrent records throughout the project that clearly show progress made and difficulties experienced

• This Assignment Task is in line with Assignment Task 1 (P1), but the evidence for this criteria needs to demonstrate further details than just a logbook/diary entry. Therefore, evidence in the form of: - regular meetings(minutes), Emails, records of contacts, decisions made which show progress, detailing difficulties and how they were overcome must be included in your logbook/diary.

Note: to achieve this criteria, your logbook/diaryentries, as specified above, must be clear and easy to follow i.e. each entry clearly labelled and with date, key points identified, and with the summary of tasks undertaken for each topic.

Assignment Task 7:

Produce drawings for the project solutions

• This criterion requires evidence of what drawings you have producedand/or modified drawings (obtained from the manufacturer datasheet/s you may have collected throughout the process of completing your project).

Therefore, to achieve this criteria you should produce a comprehensive set of drawings that meet recognised standards, and providing sufficient information to enable your product to be manufactured.

Note: for this Assignment Task you should have a set of various drawings (e.g. hand drawn, CAD drawings, Googlesketch, modified manufacturer's drawings etc.) incorporated with BS symbols and to scale.

MOST RELIABLE AND TRUSTWORTHY UNIT 3 ENGINEERING PROJECT - BTEC LEVEL 3 QUALIFICATION IN ENGINEERING ASSIGNMENT HELP SERVICES AT YOUR DOORSTEPS!

Assignment Task 8:
Check solution conforms to the specification

• Assess your final solution against your specification.Using a chart/table that shows whether you have or have not met the criteria set out in your specification.

Note: to achieve this criteria, you could produce a chart/table in line with the chart/table you produced in Assignment Task 4 c),showing the specification requirements against the chosen solution and check for the conformity of your solution.

Assignment Task 8a:

Evaluate the project solution and suggest improvements

• This Assignment Task can be undertaken by expanding your chart/table produced for Assignment Task 8.

• This can be achieved by assessing (evaluating) the value of your completed work against the specification. You may have had to compromise on specific criteria, if so discuss this and show why changes were made.

Assignment Task 9:

Deliver a presentation

• A presentation assessment sheet with the criteria to be met in your presentation is attached to this Assessment Brief (Appendix 2).

1. You will need to identify another student to complete the assessment sheet at the time of your presentation. Remember that this sheet forms the main evidence for completing your presentation.
2. Your presentation should last for ~ 10 minutes, using PowerPoint, Smart Board etc. circa 10 slides.

Note: your presentation PowerPoint etc. must be saved electronically, and a hard copy of your presentation together with a filled in presentation assessment sheet to be inserted in your portfolio.

Assignment Task 10:

Present your portfolio with a summary written project report

• The summary of your project work, from the initiation to completion, must be presented in the form of a management report, ~ 1000 words, effectively written and to be attached to your portfolio. Your written report and portfolio should be presented with the following format:

a) Written report
1. Brief introduction
2. Main body of the report (should be broken down into topics and subtopics)
3. Conclusion

b) Portfolio
1. Cover sheet
2. Contents page
3. Work referenced against the assessment criteria
4. Bibliography / Reference page
5. Pages numbered (this can be undertaken using a pen).

Assignment Task 10a:

Present coherent and well-structured development records and final project report

• This Assignment Task is in line with Assignment Task 10 (P10), and not only requires that your final report is logically presented, all evidence is referenced against the set criteria, pages are numbered and all documentation is effectively written. It should also be of a high standard in presentation, neatness, spelling, with clear evidence of research and clear sources of references.

Assignment Task 11:

Independently manage the project development process, seeking support and guidance where necessary

• To achieve this criteria, your evidence will need to clearly show your total involvement, progressive development, and your control of the Assignment Task throughout the time allotted. You will have demonstrated an effective role throughout. To verify this, you will need to complete your own BTEC Observation Record Sheet for your tutor to sign and verify your independent work.

Assignment Task 12:

Evaluate the whole project development process, making recommendations for improvements

• This is in line with Assignment Task 10 (P10), but you will need to establish criteria for a good development process so that you can evaluate your process for monitoring your project development. Therefore, as an attachment to your ~ 1000 words report in Assignment Task 10, you must evaluate the project development process and make recommendations for future improvements.

Criteria reference

To achieve the criteria the evidence must show that the learner is able to:

P1

Prepare and maintain project records from initial concepts through to solution that take account of and record changing situations.

P2

Prepare a project specification.

P3

Agree and prepare the procedures that will be followed when implementing the project.

P4

Use appropriate techniques to evaluate three potentialsolutions and select the best option for development.

P5

Outline the project solution and plan its implementation.

P6

Monitor and record achievement over the life cycle of the project.

P7

Implement the plan and produce the project solution.

P8

Check the solution conforms to the project specification.

P9

Prepare and deliver a presentation to a small group outlining the project specification and proposed solution.

P10

Present a written project report.

M1

Maintain detailed, concurrent records throughout theproject that clearly show progress made and difficultiesexperienced.

M2

Use a wide range of techniques and selection criteria to justify the chosen option.

M3

Evaluate the project solution and suggest improvements.

M4

Present coherent and well-structured developmentrecords and final project report.

D1

Independently manage the project development process, seeking support and guidance where necessary.

D2

Evaluate the whole project development process, making recommendations for improvements.

HAVING PROBLEMS IN WRITING YOUR UNIT 3 ENGINEERING PROJECT ASSIGNMENT WITH PERFECTION? HIRE TOP CLASS SUBJECT EXPERTS OF MIRACLESKILLS TO SCORE TOP-NOTCH GRADES!!

RELATED COURSES & ASSIGNMENT SERVICE!!


COMMENTS(0)

LEAVE A COMMENT


Captcha

 

 

Are You Looking for Engineering Project Assignment Help?


Engineering Project Solution:

GET ASSURED A++ GRADE IN EACH UNIT 3 ENGINEERING PROJECT ASSIGNMENT ORDER - ORDER FOR ORIGINALLY WRITTEN SOLUTIONS! 

DESIGN IN ENGINEERING

TASK 1

Creating countries are as yet battling to advance a practical administration structure for their railroad transportation frameworks. Absence of practical administration is making railroad business unbeneficial in developingand created countries. In January 2012, when British Airports Authority (BAA) put Edinburgh Airport available to be purchased, there was a furious offering war because of expected productivity of the air terminal and the much looked for after resources in the air terminal offices. After seven days, there was greeting to delicate for the Intercity West Coast Franchise featuring the requirement for another administrator to put resources into some poor, unfruitful railroad stations across United Kingdom. The reaction was demoralizing. Air terminals and railroad stations clearly offer a similar significant type of assistance - they permit travelers to board and leave a method of transport, they give chance to shopping for food and they are nodal focuses for voyagers. Be that as it may, while one resource is profoundly pined for by the private part, the different requires open sponsorship, neglects to convey the imperative client assistance and isn't utilizing solid business openings.

Building Envelope Design, is the primary part of the Energy Conservation Construction law for Residential Buildings to be propelled. Its initial and prompt presentation is to improve the development and plan of new private structure stock, as it is being constructed at present and soon, to fundamentally diminish the foreseen vitality interest for comfort cooling in times to come. This basic interest in envelope development and structure made today will receive rewards of diminished GHG outflows for the lifetime of the structures [2]. The code is structured in an easy to-apply design, requiring just math classification in view of the compositional plan drawings of the private structures. This will be usable by draftsmen just as designers and won't require any particular aptitudes or recreation virtual products. This likewise empowers the Code to be promptly received in the Building Byelaws and administrative instruments, for example, Environmental Clearance for Large Projects.

TASK 2
As protection estimations of new structures improve, the need to constrain heat misfortune through warm crossing over turns out to be progressively significant. Off base enumerating at configuration stage or poor development work can have a huge antagonistic impact on building execution. The protection envelope of any warmed structure ought to be planned and built to restrict heat misfortune through warm spanning [3]. The key regions of concern are: rehashing warm spanning inside structure components, and non-rehashing warm spanning at the intersection between building components and at the edges of building components where openings in the envelope are framed. A structure that was initially intended to be unheated has, in many occasions, the best void to fill as far as vitality proficiency. The acquaintance of warming with such structures will, if not joined by texture protection, bring about lopsided warmth misfortune and inefficient use or fuel and influence.

TASK 3
Restricted regions of a similar structure component might be intended to give a more unfortunate presentation. These thus should be repaid by the remainder of the component being structured and worked to an additionally requesting level. Where a fair and down to earth approach is taken to decreasing vitality request in new abodes, a reliable and great degree of texture protection will confine heat misfortune through the structure envelope. A case of this would be meters enclose set to an outside divider. These restricted regions ought to have a U-esteem no more awful than the figures given in segment (b) of the table beneath.

TASK 4

MIRACLESKILLS.COM GIVES ACCOUNTABILITY OF YOUR TIME AND MONEY - AVAIL TOP RESULTS ORIGINATED UNIT 3 ENGINEERING PROJECT ASSIGNMENT HELP SERVICES AT BEST RATES!

TASK 5


1

2

3

4

5

6

7

8

9

10

11

12

13

14

A















B










******

*****






1

2

3

4

5

6

7

8

9

10

11

12

13

14

A















B















TASK 6

Envision a venture where everybody is accomplishing the work, yet there is no coordination. This prompts an uneven spending plan and terrible outcomes. Thinking about the significance of this procedure, the duty of completing it ought to be separated between everybody in the group; each colleague ought to add to making the last picture. WBS is for the most part centered around expectations. To put it plainly, it is a plan for the day from which we produce a rundown of errands and their conditions. This is the reason it's major that all the on-screen characters of the task engage in its creation [2]. By recognizing the key expectations, you can evaluate time and costs required for the venture to complete and what number of individuals you need in your group. You will realize how to separate the work between your group and what are the characteristics they have to have to finish the work. In each period of the work, you will have an away from of the advancement. This structure can maintain your emphasis on the spending limit since you will consistently have command over expenses at each phase of the work.

TASK 7

Resource clashes happen ordinarily when you are entering the Resources against the errands. You may not have seen that a similar Resource is required in more than one spot. Be that as it may, in light of the fact that Microsoft Task is continually recalculating the beginning and finish dates it can give you precise insights concerning these covers, or over-distributions, in work duties.

The way toward settling these over-distributions is called leveling (in spite of the fact that Project spells it as Leveling). This term comes from the way that in an ideal undertaking the entirety of your Resources will be spread equitably, or straight, over the extent of assignments. An over-portion recommends that you have a knock or pinnacle utilization that should be resolved. In the diagram the thicker line at 500% shows this is the greatest units that we have in the Resource pool. Any bar over this line shows an over allocation of Resources. Thiscresting should be disposed of. Microsoft Project furnishes you with the capacity to consequently or physically level over allocations. In the event that you pick programmed leveling Microsoft Project will endeavor to determine the contention for you. For the most part this is finished by slipping the undertaking dates out [5]. It does this by adding postponement to the assignments so Resources are not required simultaneously. Be that as it may, with programmed leveling you do relinquish power over your venture. A great many people like to determine over-distributions physically.

Resource leveling methods are firmly related with basic way computations. Thus, absolute buoy, movement groupings and rationale of the system graph impact the necessary Resource amounts per time. Resource leveling, called Resource Leveling, is a strategy that evades over-allotment. Resources are taken from non-basic exercises and assigned to basic exercises. Notwithstanding, while at the same time leveling guarantees that Resources are not overestimated, staying away from spikes, the strategy commonly expands venture time. Along these lines, cost and time examination ought to be done before leveling and reverified in the wake of applying the strategy.

TASK 8

HIRE PROFESSIONAL WRITER FROM MIRACLESKILLS.COM AND GET BEST QUALITY UNIT 3 ENGINEERING PROJECT ASSIGNMENT HELP AND ASSESSMENT WRITING SERVICES!

TASK 9

The utilization of Information Technology (IT) to development venture the executives (CPM) has gotten pivotal to the fulfillment of undertakings as per the particulars of time, quality and expenses. In any case, there are challenges in envisioning the arranging and work progress in space and coordinating data between partners. Building Information Displaying (BIM) can assemble vital data at various phases of a venture's lifecycle, including creation the executives. This investigation had as the principle target to talk about techniques for the portrayal and examinations of 4D Modeling to development the board and to assess the significance and appropriateness of those methodologies, created for the situation study, in light of the Brazilian development expert's view. According to 4D Models techniques assessed in this review, the shading use for the separation of inner exercises to encourage interior perception had the high potential affirmed by members, particularly for those with more elevated level of information and utilization of BIM [7]. Among the 4D Model possibilities that were seen during application and assessed, the distinguishing proof of clashes of reality and the combination/correspondence between all partners had the most noteworthy degrees of significance, albeit different possibilities likewise had a high degree. The distinguishing proof of contentions of reality what's more, exertion decrease in representation and mental understanding of the calendar were the most appropriate, while support in the sequencing and perfect reasonableness of the calendar work rate was viewed as less material. A few current CAD programming programs utilize the Extended Markup Language (XML) pattern which when applied to BIM information has been characterized as "building information in a rearranged spatial building model for BIM cooperation". It is a streamlined interchange language for structuring in 3D from traditional CAD with the essential advantages of supporting high information gushing (TECA07) what's more, accommodating enhanced principles of trading data (TECA02) (BIMXML, 2014). This would empower a two measurement (2D) attracting to be changed over into a 3D model, through the expulsion work, that would then allow route continuously (PPFA12) by means of a fly or walk through.

This examination gives signs about the best procedures to speak to and break down 4D Models applied to development the executives as indicated by proficient vision of Brazilian development area, including explicit tests of experts gatherings, filling a hole of inquire about in this BIM region [8]. The overview restrictions are identified with examining, on the grounds that the overview was directed with Brazilian development experts, a particular nation that has social attributes and its own innovative turn of events.

TASK 10

The thoughts which concentrated on the reliance between the social and natural measurements of maintainability were just referenced twice ('decrease clamor' and 'diminish utilization of essential farmland').The experts appeared to see the connection between the two measurements basically as a chance to decrease unwanted reactions, similar to clamor during the development and activity of the railroad station. The piece of essential farmland, which must clear a path if the railroad station is found further away from the downtown area, could be diminished. In that sense, by implication, the area decision really influences all parts of manageability, as closer to the downtown area would be better financially, socially (closer to social and financial exercises) and ecologically (less farmland lost). Initial, three thoughts looked to improve social and financial manageability: 'circulate encompassing ventures judiciously', 'organize great offshoot offices' and 'increment business'. The experts imagine that the zones encompassing the station ought to be explicitly apportioned to organizations to increment business and monetary turn of events. Extra offices for the station, for example, stopping and transportation offices were additionally considered from this viewpoint.

Social and natural components of supportability were associated in two thoughts referenced by the experts ('make normal views' and 'focus on plants'). The two thoughts encourage theincorporation of regular arrangements in the structure of the encompassing regions (explicit vegetation or nearby views) for people in general.

TASK 11

Creating countries, countries where the normal pay is a lot of lower than in industrialized countries (created countries), where equalization of exchange is yearly negative and where crude agribusiness is as yet polished, are as yet battling to advance a reasonable administration structure for their railroad transportation frameworks. Railroad station offices have numerous tasks to carry out in the fruitful activity of railroad transport business. Railroad stations have since quite a while ago involved a sentimental corner of the well known creative mind they despite everything hold an especially affectionate spot in the cutting edge open mind. While they may never again be the "houses of prayer of steam" of Victorian occasions, stations are currently driving another rush of financial and social advancement in the 21st century . Stations are performing a greater number of capacities than prior idea with some facilitating lodging administrations.

TASK 12
All railroad stations will be productive if the jobs of maintainable administration of rail line stations are not consigned in creating countries. Openings flourish to reposition rail business in Nigeria through financial, viable and proficient administration of the stations. Stations have huge premises around it having a place with Nigeria Railway Corporation which can be formed into workplaces, shopping arcade, stockrooms and vehicle leaving. Railroad System Improvement (RSI) is the arrangement. The cutting edge explorers have a larger number of necessities in their movement than moving from a point to another. The person in question needs to unwind when their excursion in the comfortable premises of the vehicle mode. Air terminals offices offer this administration perfectly. Railroad stations ought to be upgraded to rival different methods for transport, particularly air transport. Railroad transport administrators should use on the advantages of train stations to produce more salary as stations are no more premises where travelers just board and drop from trains; they are frameworks for shopping, meeting, eating, keeping baggage, leaving vehicles and unwinding. Proficient offices directors must be locked in to be responsible for the administration of the stations to guarantee most extreme advantages.

GET BEST UNIT 3 ENGINEERING PROJECT - BTEC LEVEL 3 QUALIFICATION IN ENGINEERING ASSIGNMENT HELP SERVICE FROM MIRACLESKILLS!!

Miracleskills offers BTEC Level 3 Qualification in Engineering Assignment Help Services in All Units Which includes:

  • Unit 1 Health and safety in the engineering workplace Assignment Help
  • Unit 2 Communications for technicians Assignment Help
  • Unit 3 Engineering project Assignment Help
  • Unit 4 Mathematics for engineering technicians Assignment Help
  • Unit 5 Mechanical principles and applications Assignment Help
  • Unit 6 Electrical and electronic principles Assignment Help
  • Unit 7 Business operations in engineering Assignment Help
  • Unit 10 Properties and applications of engineering materials Assignment Help
  • Unit 16 Engineering drawing for technicians Assignment Help
  • Unit 35 Principles and applications of electronic devices and circuits Assignment Help