ARE YOU LOOKING FOR UNIT 18 CIVIL ENGINEERING TECHNOLOGY ASSIGNMENT HELP SERVICE? HIRE SKILLED TUTOR TO BOOST YOUR GRADES!

Qualification - Higher National Certificate/Diploma in Construction and the Built Environment

Unit Name - Civil Engineering Technology

Unit Number - Unit 18

Assignment Title - Civil Engineering Technology

Learning Outcomes

Learning Outcome 1: Explain the methods and techniques used in civil engineering for earthworks and substructures.

Learning Outcome 2: Present a safety plan risk assessment and method statement for a given civil engineering activity.

Learning Outcome 3: Evaluate a given civil engineering problem and propose a solution. LO4 Prepare a design proposal for a new infrastructure project.

GET QUALITY UNIT 18 CIVIL ENGINEERING TECHNOLOGY ASSIGNMENT HELP SERVICE IN HIGHER NATIONAL CERTIFICATE/DIPLOMA IN CONSTRUCTION AND THE BUILT ENVIRONMENT!

Assignment Brief

Scope
You have been asked to prepare a report that covers: key methods and techniques for earthworks and substructure activities; a safety plan with a risk assessment and method statements for a defined civil engineering activity; a civil engineering problem and its proposed solution; and a design proposal for a new infrastructure project.

The solution of the identified and clearly defined problem in civil engineering should be explored firstly, through considering different potential solutions' options that may be available.

The construction and infrastructure project scenario provided below can be used as a Case study/Example for the whole scope of the work, or for the new work, the infrastructure project under consideration.

This assignment has four sections in line with the four learning outcomes covered by all tasks provided :

BE A CLASS TOPPER WITH UNIT 18 CIVIL ENGINEERING TECHNOLOGY - HIGHER NATIONAL CERTIFICATE/DIPLOMA IN CONSTRUCTION AND THE BUILT ENVIRONMENT ASSIGNMENT HELP!

SCENARIO
(Learners are to sketch the layout plan only of this practical Construction Project scenario and use and apply it where specified or needed as an example or case study especially in the consideration of specifications for construction materials, services and methods choices suggested)

You have been appointed to prepare an initial conceptual design and implementation report on an Industrial complex (1km by 1km) near a couple of near parallel expressway highways 12km apart that both link the megacity of London to an international airport in the outskirts of London, Heathrow to be specific. The site of this complex is separated from one of the express highways by a large fast flowing River that flows parallel to these highways and finally finds its way into the River Thames .This River which is about 20m wide lies in the middle (that is midway) of the 4 kilometre land space between the chosen Industrial complex site and one of the two expressways.

The Client who is a private investor needs ten (10) industrial building(s) and factories manufacturing baby foods, soaps, perfumes amongst several other commodities. This site is proposed together with some inter-connecting Infrastructure to the alternative highway on the other side of the site 6 km away, which is not only necessary but required as a key element of the project; the factories buildings are made of both steel, concrete and other materials (to be specified). These industry and factory buildings are provided as key structures of high specification that are intended to be built for the long term duration in this part of south of England, around the Heathrow Airport. The Industrial complex can be developed with steel or concrete or alternatives or a combination. The access interconnecting infrastructure roads to both highways can be flexible or rigid and the bridge across the stream and the walkway across the highways can be made of either RC concrete or steel, all in line with your choices for the project

ASSESSMENT TASK 1

Part (a) Using the scenario provided, discuss the earthworks, equipment and techniques

Part (b) For the scenario above or otherwise describe the methods that used to create complex foundations, piling works and drainage works.

Part (c) The scenario above is likely to include culverts and underpasses in the design of the complex infrastructure. Describe methods and techniques used in culvert and underpass construction including the provision for some utilities to be named.

Part (d) Assuming that some of the structures such as office blocks in the industrial park in the scenario above has deep basements, analyse methods and techniques utilized in large and complex earth moving operations and deep excavations..

Part (e) Evaluate methods and techniques used in dealing ground and slope stability for slopes found to be unstable in the vicinity of the industrial park area.

GET TRUSTED ADVICE OF WRITERS FOR UNIT 18 CIVIL ENGINEERING TECHNOLOGY ASSIGNMENTS OR DOWNLOAD SOLVED SAMPLE ASSIGNMENTS TO ACHIEVE BETTER GRADES!!

ASSESSMENT TASK 2

Part (a) For the construction options of the industrial park above, identify the hazards, risks and safety arrangements, working in confined spaces, working on structures including tall ones and for working within any temporary works that may be included in the interconnecting highways and local infrastructure.

Part (b) For the scenario above or otherwise, develop and present a safety plan, risk assessments and method statements for a given civil engineering activity to be identified.

Part (c) In general, discuss health and safety legislation and codes of practice related to civil engineering sites such as provided in the scenario above.

Part (d) Justify a site safety plan, risk assessments and method statements report for identified activities related to a the scenario project above.

ASSESSMENT TASK 3

Part (a) Explore and evaluate the environmental, quality, geotechnical and economic contests of a civil engineering problem to be chosen amongst several identified problems to be identified and propose and explore a viable solution to this problem, justifying the selection of specific engineering features in the development of the solution.

Part (b) Develop a proposal that states how the environmental, geotechnical, quality and economic contexts of the problem identified in (a) are addressed.

ASSESSMENT TASK 4

Part (a) With the scenario above describe methods and techniques used in highway design and develop a proposal for the new infrastructure access for the project.

Part (b) Using the scenario above , analyse methods and techniques used to create bridge foundations and flexible highway construction foundations stating the key criteria needed, including key geotechnical parameters to be identified.

ACQUIRE MOST RECOMMENDABLE ONLINE UNIT 18 CIVIL ENGINEERING TECHNOLOGY ASSIGNMENT HELP SERVICE!

RELATED COURSES & ASSIGNMENT SERVICE!!


COMMENTS(0)

LEAVE A COMMENT


Captcha

 

 

Are You Looking for Civil Engineering Technology Assignment Help?


Get the best Higher National Certificate/Diploma in Construction and the Built Environment Assignment Help Services for its related units such as:-

  • Unit 1: Individual project (Pearson-set) Assignment Help
  • Unit 2: Construction Technology Assignment Help
  • Unit 3: Science & materials Assignment Help
  • Unit 4: Construction practice & management Assignment Help
  • Unit 5: Legal & statutory responsibilities in construction Assignment Help
  • Unit 6: Construction information (drawing, detailing, specification) Assignment Help
  • Unit 7: Surveying, measuring & setting out Assignment Help
  • Unit 14: Building information modelling Assignment Help